31 May 2013

We have scaffolding !





... either that or a very draughty house with extensive views.

Timber frame kit will be craned over the scaffold (in theory!)

24 May 2013

We have a concrete slab !



All concrete now in. The shuttering will be removed in the next day or two.

23 May 2013

Concrete arrives on site




Steel fibre reinforced concrete. First of five loads delivered and poured.

22 May 2013

20 May 2013

Pods



Insulslab pods installed. Steel Fibre Reinforced Concrete to be poured in next.

18 May 2013

Insulation has arrived on site




Insulslab pods, stacked up on the right, go in next and will be placed on top of the 100mm insulation boards.

16 May 2013

Shuttering has arrived on site



Insulation will arrive next. Shuttering will sit on 100mm insulation boards.

5 May 2013

We have signage !


Temporary sign. Builders and delivery drivers will now be able to find us.